Projects
-
New planning of the swimming pool Ennigerloh
The swimming pool Ennigerloh is to be re-designed into a bath with biological water purification.
Contractor: Business and spa operation
Period: 2019-2020
Phases: 1-9
Planning fee: 380.000 €Place: Marktplatz 1 59320 Ennigerloh
Construction costs: 2.000.000
honorary regulatio hoai: Part II and Part IV, General Planning
-
Natural outdoor swimming pool Beelitz
Contractor: Municipality of Beelitz
Period: - 06.2021
Phases: 1-9
Planning fee: 400.000,00 €Place: Berliner Str. 202 14547 Beelitz
Construction costs: 3.300.000,00 €
honorary regulatio hoai: Part 1 - part 9 -
Planning the water remediation including an urban swimming area
The Auenweiher in Fulda are to be upgraded in the framework of the Landesgartenschau 2023.
Contractor: Municipal Authority of Fulda
Period: 2017-2022
Phases: 1-4Place: Schlossstraße 1 36037 Fulda
Construction costs: 1.500.000 €
honorary regulatio hoai: Teil II und Teil IV
-
Dong Feng lake, WADI, Polyplan
Polyplan is Consultant in the Dong Feng lake (surface 200 ha) restoration concept. Within 5 Years the lake needs to change the tropic state from hypertroph to eutroph. The Projekt ist in the concept design phase.Contractor: WADI ENGINEERING AND DESIGN Co., LTD. Mr. Hao Wu EIJINGJianwai Soho, Tower 1, Unit 504 39 Mi
Period: 2018 - 2023
Phases: 1-3Place: Yu Nan, China
Construction costs: ca. 30.0000.000 €
-
Hypolymnetic deep water aeration for the Aabach Reservoir
The Aabach dam was built until 1983 in the state of North Rhine-Westphalia in operation. It is located in the East Westphalian circle Paderborn, about 2.8 km southeast of Bad Wünnenberg.Contractor: Wasserverband Aabach-Talsperre
Period: 2018 to 2019
Phases: 1-9Place: Bleiwäscher Straße 6 33181 Bad Wünnenberg Tel.: +49 (2953) 9877-14 Fax: +49 (2953) 9877-10
Construction costs: 450.000 €
-
Køge, Dänemark, Urban storm water management modelling
The storm water mnagement for the new Köge devellopment area needed to include a treatment. The limit PT concentration of the runoff is 100 µg/l.Contractor: KLAR Forsyning A/S
Period: 2018-2020
Phases: 1-9Place: Vasebækvej 40 4600 Køge
Construction costs: 1.400.000
honorary regulatio hoai: TGA, Modelling
-
Floating Harbor Pool Aarhus
Unique Concept Design "Basin in treated Cover Basin"
The attractive harbor pool in Ahus consists of a spacious platform in which 3 pools are embedded.Contractor: AarhusKommune, Team Byggemodning
Period: 2017 - 2018Place: Teknik og Miljø Center for Byens Anvendelse Aarhus Kommune Kalkværksvej 10, 8000, Aarhus C
-
Balneon
Natural outdoor pool and sauna pool in Neustadt Photos: Author Christian Bierwagen
Contractor: Wirtschaftsbetriebe Neustadt am Rübenberge GmbH
Period: 2017-2018
Phases: 2-8
Planning fee: ca. 104.000,-€Place: Neustadt am Rübenberge
Construction costs: 623.000,-€
honorary regulatio hoai: Part IV
-
Tibean versus oxygenation
Study comparing hypolimic ventilation with atmospheric air (Tibean) versus oxygen fumigation
Contractor: Wasserverband Aabachtalsperre
Period: 9/2017 to 3/2018
Phases: 1-2Construction costs: 250.000 €
honorary regulatio hoai: Part II and Part IV, General Planning
-
NSP, Natural swimming pool, Canada Polyplan
The Borden parc Project has been realized by the partners GH3 and Polyplan. GH3 was responsible for the landscape and Building design. Polyplan was responsible for the Pool function, the water treatment, pump and pipe design and for micro controller system.
Contractor: Edmonton, Canada, Robb A.A. Heit, B.A. Program Manager |
Period: 2013-2018
Phases: 1-9Place: Edmonton, Edmonton Tower, 10111-104 Avenue NW Edmonton, T5J 0J4 t 780-496-5060
Construction costs: approx. 6 mio. CAD
-
Naturbad Ruds Vedby
Friluftsbadet Ruds VedbyContractor: Jesper Fussing Hjortgaard, Telefon 1: 0045 51325752
Period: 2013- 01.06.2015
Phases: 1-8Place: Ruds Vedby, 4291, Dänemark
Construction costs: 1.500.000 €
-
Natural outdoor swimming pool Hainholz
In 2018, the outdoor pool Hainholz awakens in new splendor.
The outdoor pool Hainholz had to be renovated due to structural defects.Contractor: City of Hannover Department of Sports and Pools
Period: 11.2017-5.2018
Phases: Part II and IVPlace: 0159 Hannover Tel. 0511/16836298 Fax. 0511/16834178
Construction costs: 600.000 €
-
Forest beach pool Windsbach
Planning of the outdoor pool Bad Kriens in cooperation with Wasserwerkstatt Bamberg.Contractor: City of Windsbach
Period: 2016 - 2017
Phases: 1-9Place: Ortsteil Retzendorf in Windsbach Germany
honorary regulatio hoai: Part II
-
Outdoor pool Herrenberg
Contractor: City Herrenberg
Period: 2014-2015Place: Stuttgarter Straße 92,
-
Natural Outdoor Swimming pool Froschloch
Contractor: Sportwelt Dortmund GmbH, Frau Heckmann, Tel: 0231 - 941 8310
Period: 2007 - 2008
Phases: 1-8
Planning fee: 280,000€Place: Schwimmweg 2, 44139 Dortmund
Construction costs: 1,700,000€
honorary regulatio hoai: Part 2, Part 4
-
Natural swimming pool Tostedt
Preparation of a preliminary design for the renovation and redesign of the outdoor swimming pool Tostedt.Period: 2015
Phases: preliminaryPlace: Am Freibad 14 21255 Tostedt Germany
-
Aysén Chile
Aeration concept and simulation of water quality for the new reservoir cuervo 13,000 ha.Contractor: Austral Energy
Period: 2015Place: Santiago de Chile
Construction costs: 80.000 €
-
Tessiner Südsee
The Tessiner Südsee, a beach 40 km from the Baltic Sea.Contractor: City of Tessin, Alter Markt 1 18195 Tessin Tel.: 0049 38205 78121
Period: 2010-2012
Phases: 1-9
Planning fee: 150.000 €Place: Alter Markt 1 18195 Tessin Germany
Construction costs: 1.300.000 €
honorary regulatio hoai: Part II and Part IV, General Planning
-
Outdoor pool Hallenberg
The outdoor pool Hallenberg is a small attractive public pool with biological water treatment with the involvement of the passing river Nuhne.Contractor: City of Hallenberg
Period: 2009
Phases: 1-9
Planning fee: 130.000 €Place: Rathausplatz 1, 59969 Hallenberg, Germany Telefon 0049 2984-303 -0 www.stadt-hallenberg.de
Construction costs: 790.000 €
honorary regulatio hoai: Part II and Part IV
-
Canal Hannover
Extension of the Lister canal
The Lister canal is located between Edgar-Scheibe-Straße and the Leo-Sympher Promenade in Hannover.Contractor: Apothekerversorgung Lower Saxony, Mr. Reinbold, Gutenberghof 7, 30159 Hannover, Germany Tel.: +49511 - 70021206
Period: 2013-2014
Phases: 1-8
Planning fee: 68.000 €Place: 30159 Hannover, Germany
Construction costs: 450.000 €
honorary regulatio hoai: TGA und Freiraumplanung
-
Natural Outdoor Swimming Pool Bingen
Contractor: Stadtwerke Bingen, Herr Marco Mohr, Tel: 06721 970713
Period: 2008-2009
Phases: 1-9
Planning fee: 230,000€Place: Saarlandstraße 364, 55411 Bingen am Rhein
Construction costs: 1,759,000 €
honorary regulatio hoai: Part 2, Part 4
-
Wahnbachtalsperre
Polyplan designed 2 Tibeans for the reservoir Wahnbachtalsperre with a capacity of 14.400 m³/hour.
Contractor: Wahnbachtalsperrenverband, Mr. Krohm
Period: 2014
Phases: 1-5Place: Siegelsknippen 53721 Siegburg
Construction costs: 630.000 €
-
Outdoor swimming pool Kriens
Contractor: Community CH-6010 Kriens / Lucerne
Period: September 2011 to July 2012
Phases: 1-9Place: Horwerstrasse 24, 6010 Kriens, Switzerland
honorary regulatio hoai: Part IV -
Outdoor swimming pool Hänigsen
The outdoor pool Hänigsen was awarded the "Public Value Award for the public bath 2016" by the "German Society for the Baths" in 2016.Contractor: Outdoor pool cooperative Hänigsen
Period: 2015-2016
Phases: 1-9Place: Am Fließgraben 32, 31311 Uetze Germany
-
Outdoor swimming pool Weende
Creation of a design plan for the first open-air swimming pool in Germany, which offers a year-round combined use as an outdoor swimming pool and as a park.Contractor: Göttinger Sport und Freizeit GmbH & Co. KG
Period: 2016-2018
Phases: 1-3Place: Am Weendespring1, 37077 Göttingen Germany
Construction costs: ca. 2 Mio €
honorary regulatio hoai: Part II and Part IV
-
Natural swimming pool Zeven
The Zeven natural swimming pool is run by the city of Zeven. It impresses with its generous open space and the bath attractions.Contractor: City of Zeven, Am Markt 4, 27404 Zeven
Period: 2009-2010
Phases: 1-9Place: Sonnenkamp 15, 27404 Zeven Germany
Construction costs: 1.7 Mio.€
honorary regulatio hoai: Part II and Part IV
-
Natural swimming pool Kirchdorf
The natural swimming pool Kirchdorf is our first bath with biological water treatment. It has an area of 3,500 m² and is still a magnet in the region.Contractor: Municipality of Kirchdorf, chief of construction Mr. Dahm, Tel .: 0049 4273 88-23
Period: 2002-2003
Phases: 1-9
Planning fee: 80.000 €Place: Steyerberger Str. 20, 27245 Kirchdorf Germany
Construction costs: 360,000 € plus 120,000 € own contribution
honorary regulatio hoai: Part II and Part IV
-
Floating Pool Gothenburg
Our engineers together with Raumlabor (Berlin), created the floating pool in the Frihman, Gothenburg.
Period: 2015
Phases: 1-9Place: Frihamnen 9, Gothenburg, Sweden
-
Swietochlowice water park
Contractor: Swietochlowice, Poland
Period: 2007-2011
Phases: 1-8Place: aleja Parkowa 15, 41-600 Świętochłowice, Poland, Mateusz Szampera, Telefon 1: 0048323491-900
Construction costs: 1.800.000 €
honorary regulatio hoai: Part II and Part IV
-
Swimming pool Kriens
Planning of the outdoor pool Bad Kriens in cooperation with Wasserwerkstatt Bamberg.Contractor: Community CH-6010 Kriens / Lucerne
Period: 2011-2012
Phases: 1-9Place: Horwerstrasse 24, CH-6010 Kriens, Switzerland
honorary regulatio hoai: Part II
-
Natural Lido Kirchheim
Contractor: Regional Capital Hannover
Period: 2010-2011
Phases: 1-9Construction costs: 350,000
honorary regulatio hoai: Part2, Part 4
-
Lake Steinbrunn
Deep water aeration in the lake SteinbrunnContractor: community Steinbrunn
Period: 2010
Phases: 1-9Place: Lake Steinbrunn, Obere Hauptstraße 1, 7035 Steinbrunn
Construction costs: 80,000
-
Tibean Kahrteich
Contractor: Marktgemeinde Wiener Neudorf
Period: 1997Place: Europaplatz 2, 2351 wiener Neudorf
Construction costs: 58,000 €
-
Constructed wetland (old Danube)
Design of a constructed wetland to improve the hydrogen carbonate concentration of the Filling water.
Contractor: City of Vienna, Magistrat department MA 45
Period: 2012-2016
Phases: 1-5Place: Vienna, Austria
-
Summer pool Volksdorf
Contractor: HFK, Sommerbad Volksdorf, Germany
Period: 2011Place: Moorbekweg 100, 22359 Hamburg, Germany
Construction costs: 80.000 € -
Lake Balandur
Contractor: Bio Fermenta, India
Period: 2012 bis 2014
Phases: concept studyPlace: Bangelore
Construction costs: 2.500.000 € -
Bois de Vincennes-Paris
Design of a NSP inside the Parc Bois de Vincennes - ParisContractor: MAIRIE DE PARIS
Period: 2016-2018
Phases: 1-2Place: Paris
Construction costs: ca. 2.8 Mio. €
-
Singapore Sports and Community Hub
Contractor: Singapur Sports
Period: 2016
Phases: 1-3Place: Director Ivan Chang 3 Stadium Drive
Construction costs: 2.000.000 €
-
Cemetery Riensberg
Contractor: Environmental Operating Bremen, City of Bremen
Period: 2011Place: Rinsberger Straße 51, 28213 Bremen, Germany
Construction costs: 70.000 € -
Cemetery Osterholz
Contractor: Environmental Operating Bremen, City of Bremen
Period: 1999 - 2012Place: Osterholzer Heerstraße 32-34, 28327 Bremen, Germany -
Tianjin Culture Park
Contractor: Atelier Dreisetl, Überlingen
Period: 2009 - 2012Place: Tianjin, China
-
The "Südsee-Camp"
Contractor: Südsee-Camp, Wietzendorf
Period: 2011Place: Am Hanfberg 2, 29649 Wietzendorf, Germany
Construction costs: 260,000€ -
Arena lake
Contractor: City of Wolfsburg, Business Area Green 08 GBL
Period: 2007 ongoingPlace: Allerpark 12 38448 Wolfsburg, Germany
Construction costs: 30.000 € -
Glambecker lake
Contractor: City of Neustrelitz
Period: 2007Place: Glambecker See, 17235 Neustrelitz Germany
Construction costs: 50.000 € -
Achtern Diek lake
Place: Am Campingpl. 3, 21762 Otterndorf Germany -
Bathing lake Schladen
Contractor: local community of Schladen
Period: 2004Place: Am Badeteich, 38315 Schladen Germany
Construction costs: 300.000 € -
Steinhäuserwühlsee
Deep water aeration for the elimination of vinyl chlorideContractor: Simens AG
Period: 2014 - 2016Place: Steinhäuserwühlsee, 67346 Speyer, Germany
Construction costs: 450.000 €
-
Tianjin Airport urban lake
Planning of a central urban water system in Tianjin Logistics Park, ChinaContractor: Atelier Dreisetl, Überlingen
Period: 2010 - 2011
Phases: 1-8Place: Tianjin, China
Construction costs: 1.500.000 €
honorary regulatio hoai: Part IV
-
Perth Riverfront
Contractor: Atelier Dreisetl, Überlingen
Period: 2011Place: Perth, Australia -
Twin Tower project
Contractor: Atelier Dreisetl, Überlingen
Period: 2011 - 2014Place: Chongqing, China -
Telecom Park Taipei
Contractor: Atelier Dreisetl, Überlingen
Period: 2011 - 2012Place: Taipei, Taiwan -
Lecturing University Taipei
Contractor: Graduate school of Environmental Engineering, National Taiwan University
Period: 1999Place: Taipei, Taiwan -
Guangzhou May-flower Lake
Contractor: Atelier Dreisetl, Überlingen
Period: 2011Place: Guangzhou, China -
Natural outdoor pool Hüttlingen
Planning of the outdoor pool Bad Kriens in cooperation with Wasserwerkstatt Bamberg.Contractor: Community Hüttlingen
Phases: 1-9Place: Hüttlingen, Schulstrasse 10, Germany
honorary regulatio hoai: Part 2